a) Would people prefer to hold a raffle in the coming months for a table to be built in the summer? IMO this is the better option that gives plenty of time for design work and people should have all the tough decisions made by the time summer rolls around.
Or..
b) Would people prefer to have a raffle in the summer with a deadline that the winner must complete their order within 1-2 weeks of winning the raffle? Like @GenghisKhan said 1-2 weeks is way too fast and people will be rushing their design and will more than likely end up not as happy. Hell even 1-2 (even 3-4) months can be too fast for some (raises hand ). Most people enter raffles on a whim.
Whichever way it goes down here is my testimony that it's worth it to take a shot for a life changing chance. (y) :thumbsup:
A > B
Or..
b) Would people prefer to have a raffle in the summer with a deadline that the winner must complete their order within 1-2 weeks of winning the raffle? Like @GenghisKhan said 1-2 weeks is way too fast and people will be rushing their design and will more than likely end up not as happy. Hell even 1-2 (even 3-4) months can be too fast for some (raises hand ). Most people enter raffles on a whim.
Whichever way it goes down here is my testimony that it's worth it to take a shot for a life changing chance. (y) :thumbsup:
A > B