Official PCF Model Train Thread (1 Viewer)

Ordered these rail aligners that you solder to the bottom of the track. Good for lift up or lift out sections and T-Trak modules. @slisk250

PXL_20230427_034144273.jpg

PXL_20230427_034149264.jpg
 
Found this "configure your own" modular power supply. Needed 12v-16v and 18v-22v. Couldn't find a power supply that had those ranges so this 6 slot modular power supply fits the bill.

PXL_20230815_162222476.jpg
PXL_20230815_162241070.jpg
PXL_20230815_162249381.jpg
PXL_20230815_162432594.jpg
 
Took a while to find the correct combination of switches and crossovers that would work; 4 to 6 station tracks. The goal was to be able to go to any track, coming from any track, in any direction. o_O

6 double slip switches
1 LH turnout
1 RH turnout
1 crossover

2024-04-15_14-43-35.png
 
Took a while to find the correct combination of switches and crossovers that would work; 4 to 6 station tracks. The goal was to be able to go to any track, coming from any track, in any direction. o_O

6 double slip switches
1 LH turnout
1 RH turnout
1 crossover

View attachment 1312382
You do realize these trains are small enough that you can just pick them up and move them to a different track, right? That would be so much easier. ;)
 
Lot of technical stuff here. How about some badass tracks and such…
 
New main terminal board setup. Much easier to wire, configure, and troubleshoot issues.

View attachment 1312376
I took that pic before the last detector module came in. Hard to find Roco brand items in the US. I couldn't have an empty space there. :p I can definitely make use of the additional detection zones. I still have a ton of wires to run. I only have some test tracks on the topside so there isn't really much to show yet. I had to pause working on it last year due to medical issues. Things are looking better now and hopefully will stay that way.

PXL_20240418_130246815.MP.jpg
 
Found these neat storage boxes. Open one box vs 6 small boxes.

PXL_20240513_213548389.jpg
 
The key is getting them out of the boxes. Just like chips need to hit the felt, trains need to hit the rails! :p

It looks like you've been working on this setup for a while, what's your timeline on getting something up and running?

This was always my big stumbling block in transitioning from this:

tbbt-the-big-bang-theory.gif


....to something bigger, badder and more realistic. I just don't have the patience to put the months / years into a setup without being able to run them.
 

Create an account or login to comment

You must be a member in order to leave a comment

Create account

Create an account and join our community. It's easy!

Log in

Already have an account? Log in here.

Back
Top Bottom