Not much has happened lately. The main house is 95% done but the last guys who need to finish stuff arent showing up. I got the stove in so the kitchenette is pretty much done. Also went into the sub area behind the kitchenette and installed a drain so that it doesnt flood again.
The 2" drain off the left is the game room kitchen sink, the 2" pipe coming from above is the bathroom sink and tub of the main house. They go into a bypass valve that can send the water either to the septic tank or greywater line. The floor drain connects into the greywater line. The next phase will be pouring concrete and forming a basin.
The 2" drain off the left is the game room kitchen sink, the 2" pipe coming from above is the bathroom sink and tub of the main house. They go into a bypass valve that can send the water either to the septic tank or greywater line. The floor drain connects into the greywater line. The next phase will be pouring concrete and forming a basin.